The walls are up, and we are setting the Cap logs. (the logs that the rafters will rest on)
Mitch and Landon setting the Cap logs
All the walls up, and the cap logs in place
A view of the inside of the log home, from the top of the wall.
A view looking towards town from the top of the wall.
Landon drilling the hole in the bottom of the RSPL (Ridge Pole Support Log)
Moving the RSPL into place
Our tractor didn't reach far enough, so we had to do some rigging thanks to the ingenuity of Landon, we got them up!
Landon relieved that it is set in place!
No comments:
Post a Comment